ELECTRIC HOT WATER BOILER

CLDR Electric Hot Water Boiler

A clean, compact electric hot-water boiler family covering 24–1,440 kW for heating and indirect process-water duties where a suitable electrical supply is available.

JINHONG CLDR Electric Hot Water Boiler
Authentic JINHONG equipment appearance. Final interfaces, controls and arrangement follow the approved project design.
Rated Power
24–1,440 kW
Water Temperatures
85 / 60°C
Listed Efficiency
98%
Electrical Basis
380 V / 50 Hz

PRODUCT OVERVIEW

Staged Electric Heating with Eleven Listed Power Levels.

CLDR uses electric heating elements, circulation control and a digital controller in a compact packaged arrangement. It is suited to projects that prioritize local zero-combustion emissions, quiet operation and straightforward plant-room integration.

The selected model must be checked against the building or process heat balance, electrical transformer capacity, distribution system, circulation flow and destination electrical rules.

WORKING PRINCIPLE

Electrical Energy Is Staged into the Circulating Water Loop.

Treated water circulates through the boiler and external load. The controller stages the electric heating groups according to outlet-water temperature and load demand.

Protection logic monitors water availability, temperature, circulation and electrical conditions. Final sensors, interlocks, pumps and redundancy follow the approved electrical and hydraulic design.

Selection boundaryUse the listed values for initial engineering only. The final approved proposal and drawings define the supplied equipment and performance boundary.
01Power ReviewConfirm voltage, frequency, transformer and available capacity.
02Water CirculationThe selected pump maintains the design flow through the boiler.
03Staged HeatingElectric elements are loaded in steps to match demand.
04Temperature ControlOutlet and return temperatures are monitored by the controller.
05Heat DeliveryHeated water supplies the approved heating or process circuit.

TECHNICAL DATA

Verified Listed Models and Operating Data.

The table keeps model identities and values separate. Final dimensions, interfaces, components and site performance follow the approved technical proposal and drawings.

CLDR Electric Hot Water Boiler listed technical data
ModelPowerRated CapacityOutlet / ReturnEfficiencyWeightDimensions (L×W×H)
CLDR-24KW-D24 kW2 ×10⁴ kcal/h85 / 60°C98%0.18 t800×700×1000 mm
CLDR-36KW-D36 kW3 ×10⁴ kcal/h85 / 60°C98%0.20 t800×700×1000 mm
CLDR-48KW-D48 kW4 ×10⁴ kcal/h85 / 60°C98%0.22 t800×700×1400 mm
CLDR-72KW-D72 kW6 ×10⁴ kcal/h85 / 60°C98%0.25 t800×700×1400 mm
CLDR-108KW-D108 kW9 ×10⁴ kcal/h85 / 60°C98%0.32 t1300×1100×1600 mm
CLDR-144KW-D144 kW12 ×10⁴ kcal/h85 / 60°C98%0.36 t1300×1100×1600 mm
CLDR-216KW-D216 kW18 ×10⁴ kcal/h85 / 60°C98%0.56 t1500×1100×1700 mm
CLDR-360KW-D360 kW30 ×10⁴ kcal/h85 / 60°C98%0.80 t1800×1600×1800 mm
CLDR-504KW-D504 kW42 ×10⁴ kcal/h85 / 60°C98%1.10 t1800×1600×2000 mm
CLDR-720KW-D720 kW60 ×10⁴ kcal/h85 / 60°C98%1.60 t2200×1600×2000 mm
CLDR-1440KW-D1,440 kW120 ×10⁴ kcal/h85 / 60°C98%3.50 t4000×1600×2000 mm

Selection: Confirm the real heat or steam load, operating profile, utility conditions and destination requirements before selecting a model.

Performance: Actual consumption and efficiency depend on delivered energy quality, load, temperatures, tuning, system losses, maintenance and the agreed test boundary.

PROJECT ENGINEERING

Confirm Electrical Capacity and Hydraulic Conditions Before Model Selection.

A reliable proposal starts with measured or calculated project data rather than only a nominal model name.

Send project data
  • 01
    Heat Load

    Provide normal and peak duty plus operating hours.

  • 02
    Electrical Supply

    Confirm voltage, frequency, transformer rating and available current.

  • 03
    Water Circuit

    Provide supply/return temperatures, flow and system pressure.

  • 04
    Water Quality

    Send analysis and planned treatment route.

  • 05
    Controls

    Define duty/standby pumps, remote signals and building-control interface.

  • 06
    Destination Rules

    Confirm electrical, pressure, inspection and installation requirements.

SYSTEM ROUTE

Coordinate the Equipment, Utilities, Controls and User Load.

The primary equipment is one part of a complete system. Final pipe sizes, pump duties, valves, instruments and site interfaces follow the approved design.

CLDR Electric Hot Water Boiler system route
Typical system route for engineering discussion. Final arrangement follows the approved project design.
01CLDR boiler packageDefined in the approved supply scope.
02Digital controllerDefined in the approved supply scope.
03Staged heating groupsDefined in the approved supply scope.
04Temperature sensorsDefined in the approved supply scope.
05Circulation pump selectionDefined in the approved supply scope.

PROJECT SCOPE

Define Every Included Item and Site Responsibility.

The formal proposal identifies the exact model, controls, auxiliaries, instruments, documentation and customer interfaces. Items are included only when stated in the agreed scope.

CLDR boiler packageDigital controllerStaged heating groupsTemperature sensorsCirculation pump selectionWater treatment routeExpansion and ventingValves and instrumentsElectrical distribution interfaceTechnical drawings and documents

Civil works, site piping, electrical cabling, utility connections, installation, destination approvals, registration, inspection and testing are included only when explicitly stated.

APPLICATIONS

Match the Equipment to the Real Process and Operating Pattern.

Final suitability depends on load, temperatures or pressure, operating hours, utilities, water quality, emissions and destination requirements.

01

Commercial Heating

Hotels, offices, schools and public buildings.

02

Industrial Process Water

Indirect heating and temperature-control duties.

03

Laundry & Cleaning

Hot-water preparation after load review.

04

Food Facilities

Indirect hot-water duties with hygienic separation as required.

05

Remote Sites

Projects where fuel storage is undesirable and electricity is reliable.

06

Low-Noise Locations

Indoor plant rooms requiring quiet combustion-free operation.

FREQUENTLY ASKED QUESTIONS

CLDR Electric Hot Water Boiler FAQ.

Does CLDR produce local combustion emissions?

No fuel is burned in the boiler. Project environmental impact still depends on the electricity source and local rules.

Can 24–1,440 kW be selected directly from building area?

No. Select from a heat-loss or process heat-balance calculation, temperatures, operating profile and system losses.

Is 380 V suitable for every destination?

No. The listed range uses a 380 V / 50 Hz basis. The destination electrical standard and transformer capacity must be confirmed.

Does the boiler include circulation pumps?

The final pump quantity and duty are defined in the approved project scope.

Can CLDR connect to a closed circuit?

A closed or separated circuit can be engineered after pressure, expansion, safety and local-code requirements are confirmed.

What data is needed for a proposal?

Send heat load, temperatures, flow, system pressure, power supply, water quality, operating hours and destination.

TECHNICAL SELECTION

Send the Load, Utilities, Operating Conditions and Destination.

JINHONG will match the model, auxiliaries, controls and system boundary to the actual project data.