Start with useful heat—not price per tonne or cubic metre
A cheap fuel can be expensive if it contains high moisture, has low calorific value or produces poor seasonal efficiency. A higher-priced gas may still deliver competitive useful heat because combustion and control are consistent. The comparison must put both fuels on the same energy-output basis.
Use the lower heating value or another clearly stated basis consistently. For biomass, use the as-received value at the actual moisture level. For gas, use the supplier’s billing energy basis and include fixed charges where material.
Why seasonal efficiency matters
Quoted boiler efficiency is normally measured at defined conditions. Annual performance also includes part-load operation, cycling, excess air, fouling, standby loss, blowdown, fuel variation and auxiliary electricity.
A gas burner can usually modulate quickly and maintain stable combustion over a broad operating range. A biomass furnace contains solid fuel inventory and has slower response. It may perform well on a steady base load but lose efficiency when repeatedly started, stopped or held at very low output.
Use metered fuel and useful steam or heat data from a representative period where possible. If only design data are available, model normal, minimum and peak loads separately.
Operating-cost items that belong in the model
| Cost item | Biomass system | Gas system |
|---|---|---|
| Fuel delivery | Transport, unloading, sampling, storage loss and handling. | Utility tariff, capacity/demand charge or delivered-gas logistics. |
| Operators | Fuel-yard, conveying, combustion and ash duties can increase staffing. | Highly automated operation usually requires less routine fuel handling. |
| Auxiliary power | Conveyors, fans, feeders, ash systems and emission controls. | Burner, fans, pumps and controls; generally fewer solid-fuel auxiliaries. |
| Ash and emissions | Ash removal, disposal or use; particulate-control consumables and maintenance. | No solid ash from combustion, but emissions compliance and burner tuning still apply. |
| Cleaning and maintenance | More frequent fireside cleaning and wear-component attention may be required. | Cleaner fuel path and simpler handling, while boiler and water-side maintenance remain. |
| Water and chemicals | Driven mainly by pressure, makeup, condensate return and blowdown; compare on the same steam-system basis. | |
| Downtime and backup | Fuel variability or conveyor issues may require storage redundancy or backup heat. | Pipeline reliability and supply contract determine backup requirement. |
An illustrative comparison method
The following is a method, not a market-price claim. Replace every assumption with a current site quotation and laboratory result.
- Record the delivered fuel price on the billing unit.
- Convert that unit to energy using an agreed lower heating value.
- Multiply by realistic seasonal efficiency to obtain useful heat.
- Divide fuel cost by useful heat to obtain a common cost per GJ, MWh or tonne of steam.
- Add variable operating cost per useful-heat unit.
- Add annual fixed labor, maintenance and compliance costs. Keep capital and financing in a separate lifecycle calculation.
- Test the result at low, normal and high fuel prices and at different annual operating hours.
A worked example on the same useful-heat basis
Every input below is hypothetical, in USD, for arithmetic only; none is a current quotation or measured JINHONG result. Compare heat added to steam across the same feedwater-to-steam boundary and operating profile. Both efficiencies are assumed seasonal fuel-to-steam efficiencies on an LHV basis.
| Input or result | Biomass | Natural gas |
|---|---|---|
| Assumed delivered price | USD 90/tonne | USD 12/GJ of LHV fuel input |
| Assumed fuel energy | 12 GJ LHV/tonne, as received | 1 GJ LHV per billed energy unit |
| Assumed seasonal efficiency | 75% LHV | 90% LHV |
| Calculated fuel cost | 90 ÷ (12 × 0.75) = USD 10.00/GJ useful | 12 ÷ 0.90 = USD 13.33/GJ useful |
| Assumed non-fuel variable O&M | USD 4.00/GJ useful | USD 1.00/GJ useful |
| Calculated variable total | USD 14.00/GJ useful | USD 14.33/GJ useful |
The O&M allowances represent auxiliary electricity and variable consumables, water treatment, ash handling and servicing as applicable. They exclude fixed staffing, fixed maintenance, capital and finance. Heat losses are already reflected in seasonal efficiency; do not charge the same lost heat again. See efficiency definitions and LHV/HHV boundaries. An HHV gas tariff needs a documented conversion before using this LHV example; a combustion-analyzer reading is not a substitute for seasonal fuel-to-steam efficiency.
Assume 1 MW of useful output for 1,000 equivalent full-load hours: annual useful heat is 1 × 1,000 × 3.6 = 3,600 GJ. Using unrounded values gives variable annual costs of USD 50,400 for biomass and USD 51,600 for gas, before fixed costs. A hypothetical 20% biomass-price increase to USD 108/tonne changes its variable total to 108 ÷ 9 + 4 = USD 16.00/GJ. Hold other inputs constant for this sensitivity test, then vary them separately.
For real inputs, record quotation date, currency, delivery and tax terms, annual load hours and the representative as-received fuel test. Estimate cleaning and outage costs from fuel, deposit and maintenance records, using the slagging and fouling evidence checklist; ash percentage alone does not establish those costs. For a project review, share these records with the operating schedule and separate fixed-cost budget.
Calculate the biomass break-even price
A useful procurement question is: how high can the delivered biomass price rise before the gas option becomes cheaper on variable cost? Calculate gas fuel plus gas non-fuel variable O&M per useful-energy unit, then subtract the full biomass non-fuel variable O&M allowance.
For the hypothetical inputs above, the break-even biomass price is [(12 ÷ 0.90 + 1) − 4] × 0.75 × 12 = USD 93/tonne. This is variable-cost parity only; differing annual fixed costs can change the overall operating-cost decision.
Multiply that allowance by expected biomass seasonal efficiency and the as-received energy in one tonne to obtain a break-even delivered price per tonne. Keep fixed capital and financing in a separate lifecycle calculation so assumptions remain visible.
When biomass tends to be competitive
- A reliable local residue has a stable specification and low delivered cost.
- The plant operates many hours at a steady base load.
- Storage, access and ash handling fit the site.
- Operators already manage solid fuel or industrial material handling.
- Avoided waste-disposal cost or energy resilience has measurable value.
Biomass may be less competitive when fuel is transported long distances, moisture and ash are highly variable, the load cycles sharply, land is expensive or emission-control requirements are difficult.
When gas tends to be competitive
- The gas connection and tariff are favorable and reliable.
- Fast response, deep turndown and unattended operation are valuable.
- The site has limited storage or handling space.
- Labor and downtime costs are high.
- The plant has intermittent demand or many cold starts.
Gas price volatility, demand charges, connection cost and supply risk still need scenario testing. No fuel should be chosen from a single current price.
Do not ignore capital and project boundary
This article focuses on operation, but the final decision is lifecycle economics. Biomass projects often require more civil work, storage, conveyors, ash equipment and particulate control. Gas projects may require pipeline extension, pressure reduction, utility deposits or backup fuel.
Compare equal scopes: boiler, fuel system, water treatment, stack, emissions equipment, electrical loads, installation, commissioning, spares and site work. A low equipment quotation is not the same as a low installed cost.
Data needed for a project comparison
- Hourly and seasonal steam or heat profile
- Current delivered fuel quotations and contract terms
- Biomass moisture, lower heating value, ash and particle-size data
- Expected seasonal efficiency at the real load profile
- Operator wage and staffing plan
- Electricity price and auxiliary motor loads
- Ash quantity, disposal cost and emission limits
- Planned outages, backup value and financing period
A transparent spreadsheet with low, base and high cases is more useful than one “payback” number. It shows which assumptions deserve the most verification before purchase.
Technical references
This guide explains a comparison method and does not provide current fuel-price advice. Use project-specific quotations, representative fuel tests and applicable environmental requirements.