COMPACT ELECTRIC STEAM SUPPLY

ZFQ Electric Steam Generator

Compact low-pressure steam generation with staged electric heating, automatic water-level control and no on-site combustion system.

JINHONG ZFQ electric heating steam generator with integrated control cabinet
JINHONG ZFQ electric steam generator with integrated control and protection. Final heating stages, electrical components, instruments and interfaces follow the approved technical proposal and drawings.
Steam Capacity
40-1000 kg/h
Rated Pressure
0.09 MPa
Rated Steam Temperature
118°C
Thermal Efficiency
98%

PRODUCT OVERVIEW

Clean Point-of-Use Steam Without a Burner or Fuel Train.

The ZFQ electric series integrates the steam-generating body, electric heating stages, water-level control, pressure instruments, safety devices and operating controls in a compact cabinet arrangement.

The available range covers 40-1000 kg/h at 0.09 MPa. Electrical capacity, transformer allowance, cable sizing, feedwater conditions and the real steam-load profile must be checked before final selection.

01

Electric Heating

Electrical energy is converted directly into heat without a combustion or flue-gas route.

02

Compact Cabinet Layout

The generating body and principal electrical controls are arranged for a compact installation footprint.

03

Automatic Operation

Water supply, heating stages, pressure control, alarms and shutdown logic are coordinated automatically.

04

Point-of-Use Steam

Installation close to the process can reduce long steam-distribution runs where the site layout permits.

POWER-TO-STEAM ROUTE

Electrical Input, Treated Water and Automatic Heating Work as One System.

Treated feedwater enters through the matched tank and pump arrangement. Electric heating stages transfer energy directly to the water while the controller coordinates pressure, water level and operating status.

Steam leaves through the approved outlet and safety arrangement for the verified process duty. The system requires no burner, fuel storage, combustion-air fan or boiler chimney route.

Pressure boundaryThe ZFQ electric series is rated at 0.09 MPa. Confirm the required pressure at the process equipment after distribution losses before selecting this series.
01Electrical SupplyVoltage, phase, frequency, transformer and permitted connected load are verified.
02Automatic Water FeedTreated water is supplied through the matched tank and pump arrangement.
03Staged Electric HeatingHeating groups respond to pressure and operating demand.
04Protection LogicPressure, water level, electrical leakage and fault conditions are monitored.
05Process SteamLow-pressure steam is delivered through the verified distribution route.

TYPICAL SYSTEM DIAGRAM

From Electrical Supply and Treated Water to the Steam User.

The final electrical, water, steam, blowdown and safety interfaces follow the approved project design and local requirements.

Typical ZFQ electric steam generator system with electrical supply, controls, treated water, feedwater tank, pump, steam header and process user
Typical system arrangement. Final cable sizes, protection devices, water treatment, piping, valves and connection points follow the approved project drawings.

DESIGN FEATURES

Automatic Electric Heating with Coordinated Protection.

These points describe the standard ZFQ electric configuration. Final materials, heating stages, electrical components, instruments and safety logic follow the approved technical proposal.

01 / CONTROL

Touchscreen Operation

Operating status, water level, pressure, pump status and alarms can be monitored through the configured control interface.

02 / HEATING

Staged Power Control

Heating groups are coordinated to support automatic operation and load response.

03 / WATER LEVEL

Automatic Water Supply

The controller coordinates feedwater operation with the configured level-detection route.

04 / SAFETY

Multiple Interlocks

Overpressure, low water level, electrical leakage and fault conditions are monitored by the configured protection system.

05 / SERVICE

Accessible Cabinet

Control components, heating groups, instruments and service points are arranged for inspection and maintenance.

06 / INSTALLATION

No Combustion System

No burner, fuel tank, combustion-air fan or flue-gas chimney route is required for normal operation.

TECHNICAL DATA

ZFQ Electric Steam Generator Technical Data.

The listed values support initial selection. Electrical standard, feedwater conditions, heating-stage arrangement, cable sizing, dimensions and complete supply scope follow the approved proposal and drawings.

Rated Capacity40-1000 kg/h
Rated Pressure0.09 MPa
Rated Steam Temperature118°C
Thermal Efficiency98%
40 kg/h50 kg/h60 kg/h100 kg/h150 kg/h200 kg/h300 kg/h500 kg/h700 kg/h1000 kg/h
ZFQ electric steam-generator technical data
ModelZFQ0.04ZFQ0.05ZFQ0.06ZFQ0.1ZFQ0.15ZFQ0.2ZFQ0.3ZFQ0.5ZFQ0.7ZFQ1.0
Rated Steam Capacity (kg/h)4050601001502003005007001000
Rated Input Power (kW)24364872108144216360504720
Rated Pressure (MPa)0.090.090.090.090.090.090.090.090.090.09
Steam Temperature (°C)118118118118118118118118118118
Thermal Efficiency98%98%98%98%98%98%98%98%98%98%
Power Frequency (Hz)50505050505050505050
Supply Voltage (V)380380380380380380380380380380
Transport Weight (t)0.180.200.220.250.320.360.560.801.101.60
Overall Size L × W × H (mm)800 × 700 × 1000800 × 700 × 1000800 × 700 × 1400800 × 700 × 14001300 × 1100 × 16001300 × 1100 × 16001500 × 1100 × 17001800 × 1600 × 18001800 × 1600 × 20002200 × 1600 × 2000

Electrical basis: The standard table uses 380 V and 50 Hz. Confirm local voltage, phase, frequency, transformer and permitted connected load before ordering.

Output basis: Final guaranteed output and power consumption depend on feedwater temperature, supply stability, steam pressure, load profile and test conditions stated in the technical agreement.

Dimensions: Use the approved general-arrangement drawing for foundation, access, lifting, cabling and transport planning.

ELECTRICAL & SITE ENGINEERING

Confirm the Real Electrical Capacity Before Locking the Model.

An electric steam generator can simplify the plant layout, but the available transformer capacity, incoming cable, switchgear, protection and local electricity tariff must support the selected heating load.

Send electrical and process data →
  • 01
    Connected Load

    Confirm available transformer capacity and the site’s permitted electrical demand.

  • 02
    Voltage & Frequency

    Verify the actual three-phase supply before equipment design.

  • 03
    Cable & Switchgear

    Size incoming cables, isolators and protective devices for the selected load.

  • 04
    Steam-Load Profile

    Separate normal demand, peak demand, startup load and daily operating hours.

  • 05
    Feedwater Quality

    Control hardness and dissolved solids to protect heating surfaces.

  • 06
    Operating Cost

    Compare local electricity tariff and demand charges with alternative energy routes.

01Electrical SupplyIncoming power and site protection match the selected heating load.
02Control SystemHeating groups, pressure, water level and alarms are coordinated.
03Generator BodyElectric heating produces low-pressure steam without combustion.
04Water SystemTreatment, tank and pump support automatic feeding.
05Steam DistributionValves and piping deliver steam to the verified process load.

GENERATOR & SYSTEM BOUNDARY

Define Electrical, Water and Steam Interfaces Together.

A complete proposal identifies what is supplied with the packaged generator and what remains with the customer’s power distribution, piping, civil and local-compliance contractors.

Steam-generator body and insulationElectric heating groupsAutomatic control systemWater-level and pressure controlsSafety valves and instrumentsElectrical leakage protectionFeedwater pump arrangementWater-treatment optionSteam and blowdown connectionsFoundation and interface drawings

Site transformer, incoming cables, external switchgear, site piping, civil works, installation, registration and inspection are included only when explicitly stated in the agreed supply scope.

APPLICATIONS

For Verified Smaller Low-Pressure Process-Steam Loads.

Suitability depends on pressure, normal and peak demand, operating hours, electrical capacity, water quality and local equipment rules – not industry name alone.

01

Laundry & Garment

Ironing, pressing and washing loads compatible with the low-pressure route.

02

Food Processing

Cooking, vessel heating and cleaning after pressure and hygiene boundaries are confirmed.

03

Laboratory & Research

Smaller controlled steam duties where electric power and water quality are suitable.

04

Packaging

Heating and cleaning applications after the actual load and duty cycle are checked.

05

Small Process Lines

Distributed steam duties that value clean point-of-use generation and compact installation.

06

Point-of-Use Steam

Zoned steam generation that can reduce long distribution runs and standby losses.

SELECTION GUIDANCE

Choose ZFQ Only When Pressure, Load and Electrical Capacity Fit.

ZFQ provides a compact low-pressure electric route. When the process requires higher pressure, larger continuous output or the electrical infrastructure is insufficient, compare a WDR electric steam boiler or a gas/oil steam solution before final selection.

Compare steam-supply routes →
  • 01
    Strong ZFQ Fit

    Low-pressure steam, 40-1000 kg/h load, suitable grid capacity and compact installation.

  • 02
    Verify Use-Point Pressure

    Confirm required equipment pressure after steam-line losses.

  • 03
    Check Operating Reserve

    Select from normal and peak demand rather than one theoretical load.

  • 04
    Review Larger Alternatives

    Move to WDR or another industrial steam boiler when pressure or duty exceeds the generator route.

FREQUENTLY ASKED QUESTIONS

ZFQ Electric Steam Generator FAQ.

Which capacities are available?

The ZFQ electric series is available in 40, 50, 60, 100, 150, 200, 300, 500, 700 and 1000 kg/h models at 0.09 MPa and 118°C.

What electrical supply is required?

The listed range uses 380 V and 50 Hz. Final voltage, phase, frequency, transformer allowance, cable and switchgear must match the project site.

Does it require a burner or chimney?

No. Electric heating does not require a burner, fuel train, combustion-air fan or normal flue-gas chimney route.

Is the 98% value guaranteed for every project?

The listed thermal efficiency is 98%. Final guaranteed performance and test conditions must be stated in the approved technical agreement.

Does it require water treatment?

Yes. Water quality and blowdown must be controlled because scale reduces heat transfer and can damage heating and pressure parts.

When should I select a WDR electric boiler instead?

Review WDR when the project requires higher pressure, larger continuous industrial duty or a boiler configuration beyond the 0.09 MPa ZFQ route.

START WITH LOAD, PRESSURE & ELECTRICAL DATA

Get an Electric Steam Proposal Matched to Your Process.

Send normal and peak steam demand, required use-point pressure, operating schedule, feedwater conditions, voltage, frequency, transformer capacity, installation space and destination. JINHONG will confirm whether ZFQ is the correct route.