Uzbekistan · 2026 · Solid-Fuel Steam · In Production
6 TPH SZL Coal or Biomass Steam Boiler Project in Uzbekistan
JINHONG supplied one SZL6-1.25-T steam boiler system rated at 6 TPH and 1.25 MPa. The confirmed configuration can use coal or compatible biomass solid fuel and includes the boiler package, dust collection, wet flue-gas treatment, induced draft, ducting and chimney.
Verified Project Scope
A confirmed 6 TPH steam system and complete flue-gas equipment line
JINHONG completed this Uzbekistan project in 2026 around one SZL6-1.25-T steam boiler. It produces saturated steam at a rated temperature of 194°C, with a rated evaporation capacity of 6 TPH and a rated pressure of 1.25 MPa.
Customer details are withheld to protect commercial confidentiality. This case focuses on the verified equipment, site service and current status.
Fuel Capability
Coal or compatible biomass within the specified fuel range
The confirmed project configuration can use either coal or compatible biomass solid fuel. Fuel preparation and operating settings are matched to the selected fuel.
Coal operation
Coal can be used within the fuel range specified for the supplied boiler. Fuel sizing and ash characteristics remain part of project-specific operating preparation.
Biomass operation
Compatible biomass solid fuel can also be used. Particle size, moisture, calorific value and ash behavior should be reviewed before a biomass fuel is approved.
For engineering background on fuel-related deposits, review biomass boiler slagging, fouling and ash-deposit control. Final fuel acceptance and operating settings remain project-specific.
Confirmed Equipment Supply
A defined boiler and flue-gas equipment scope
JINHONG supplied the complete boiler equipment package confirmed for this project. The equipment scope covers the boiler and the defined downstream flue-gas path.
Boiler Package
One SZL6-1.25-T steam boiler rated at 6 TPH and 1.25 MPa.
Dust Collection
A multi-hopper dust collector is included in the confirmed downstream equipment line.
Wet Treatment
A wet flue-gas treatment tower is included in the confirmed downstream equipment line.
Induced Draft
An induced-draft fan supports the defined flue-gas path through the supplied equipment.
Ducting
Flue-gas ducting connects the boiler and the confirmed downstream equipment.
Chimney
The supplied chimney completes the project’s flue-gas discharge path.
Technical Configuration
SZL6-1.25-T rated project configuration
The values below are equipment ratings, not measured site-performance results.
- Quantity: One steam boiler system
- Rated evaporation: 6 TPH
- Rated pressure: 1.25 MPa
- Steam: Saturated steam
- Rated steam temperature: 194°C
- Fuel capability: Coal or compatible biomass solid fuel
- Flue-gas equipment: Dust collection, wet treatment, induced draft, ducting and chimney
Actual Project Photos
The Uzbekistan system during on-site installation
These photographs belong to this 2026 project and document its installation stage. The system has since been commissioned and placed into production.
Project Status
Commissioned and placed into production in 2026
After installation, JINHONG engineers completed commissioning and training for the supplied system. The boiler project has been placed into production. The photographs remain identified as installation-stage records because they show the earlier site-work phase.
Project FAQ
Fuel and system-scope questions
What fuel can the Uzbekistan SZL6-1.25-T boiler use?
Within its specified fuel range, the confirmed project configuration can use either coal or compatible biomass solid fuel. Fuel properties and operating settings must be reviewed for the selected fuel.
What information is needed to specify a coal or biomass SZL steam boiler?
The main inputs are required steam capacity and pressure, daily load profile, fuel type, particle size, moisture, calorific value, ash characteristics, feedwater condition, site layout and applicable flue-gas requirements.
Planning a solid-fuel steam boiler project?
Share the required steam capacity and pressure, daily load profile, available fuel analysis, feedwater condition, installation constraints and local flue-gas requirements. JINHONG can define the boiler and auxiliary-equipment scope for the actual project.
