Vietnam · Building Heating · Delivered 2026

2026 Vietnam Building Heating Project: 2 × 1.4 MW CWNS Gas Hot Water Boilers

A building-heating customer in Vietnam needed more heating capacity at peak demand, flexibility as the load changed, and provision for maintenance backup. JINHONG supplied two natural gas hot water boilers with automatic startup, shutdown and rotation, supported by engineering guidance during on-site installation. The project was delivered and put into use in 2026.

Boiler Output2 × 1.4 MW
Total Installed Output2.8 MW
FuelNatural Gas
Rated Supply / Return85 / 60°C
Two CWNS gas hot water boilers side by side during installation at the Vietnam building-heating project
Project photograph showing both boilers during installation in Vietnam.

Customer Challenge

Heating demand called for a two-boiler arrangement

The customer uses hot water for building space heating. Before purchasing the equipment, the customer faced insufficient heating capacity during demand peaks and a load that varied over time. Maintenance added another practical requirement: retaining some heating availability while a boiler was out of service.

These needs shaped the project around both heating output and the way the equipment would be used. The customer required additional capacity for peak periods, a two-unit arrangement for changing demand, and provision for maintenance backup. JINHONG paired the boiler package with engineering guidance for on-site installation.

Peak demand and changing load

Additional heating capacity, varying demand and maintenance backup were all part of the customer’s brief.

Equipment and installation support

JINHONG supplied the complete boiler package, comprising two CWNS1.4-85/60-Q units. JINHONG engineers guided the on-site installation, connecting equipment supply with practical support for the project team.

JINHONG Solution

Two units, automatic operation and a defined heating duty

JINHONG supplied two CWNS atmospheric natural gas hot water boilers, each rated at 1.4 MW. The arrangement divides the project’s 2.8 MW of installed rated output between two units, with automatic startup, shutdown and rotation.

The two-unit configuration relates directly to the customer’s capacity and maintenance requirements. Each boiler contributes its own 1.4 MW of rated output. When planning maintenance with one unit unavailable, the remaining boiler represents 1.4 MW; the full 2.8 MW rating applies to both units together. Automatic rotation is included in the supplied arrangement to alternate boiler duty.

Customer needAdditional capacity for peak heating demand
Project responseTwo 1.4 MW natural gas hot water boilers
Customer needOperation across varying heating demand
Project responseAutomatic startup and shutdown of the two-boiler system
Customer needMaintenance backup and shared boiler duty
Project responseA two-unit arrangement with automatic boiler rotation

Technical Configuration

CWNS atmospheric hot water boilers

The project uses natural gas to produce heating water. The 85/60°C designation identifies the rated boiler supply and return water temperatures.

  • Model and quantity: 2 × CWNS1.4-85/60-Q
  • Rated output: 1.4 MW per boiler; 2.8 MW total installed
  • Boiler type: Atmospheric hot water
  • Fuel: Natural gas
  • Rated water temperatures: 85°C supply / 60°C return
  • Controls: Automatic two-boiler startup, shutdown and rotation

Actual Project Photos

Two-boiler installation and equipment details

These photographs document the installation stage, showing the boiler bodies, front-mounted burners, flues and site pipework from different viewpoints.

Explore more JINHONG boiler project cases →

Project Delivery

Delivered and in use in 2026

The two-boiler package has been delivered and put into use for building heating in Vietnam. JINHONG’s contribution combined equipment supply with engineering guidance for on-site installation, bringing the customer’s heating requirements into a two-unit boiler arrangement.

Delivery Year2026
Current StatusIn use
ApplicationBuilding Heating
Boiler Quantity2 Units

Planning a hot water boiler system for building heating?

Share your heating load, required water temperatures, available fuel and maintenance-backup needs. JINHONG’s engineering team can review the duty and prepare a boiler proposal.

Request a Heating Solution