Verified JINHONG Project · Customer Site
8 TPH Oil/Gas Steam Boiler for Textile Dyeing in Egypt
A JINHONG oil/gas-fired steam boiler installed for a textile dyeing customer in Egypt. The customer-site photographs show the complete boiler, burner end and operating-area arrangement.

Project Application
Stable process steam for textile dyeing
The 8 TPH boiler provides the steam source specified for textile dyeing and related wet-processing stages. Its oil/gas firing configuration gives the customer a compact steam-boiler arrangement suited to the plant’s production area.
Textile steam demand
Process steam is used across dyeing, washing and temperature-controlled textile production stages.
Installed configuration
The verified customer-site record shows the horizontal boiler body, burner end, access platform and project-area piping.
Customer-Site Record
The JINHONG boiler installed at the Egypt project
All photographs below belong to this 8 TPH textile-dyeing project. The equipment is shown at its natural proportions so the boiler body and burner arrangement remain visible.



Planning a textile steam system?
Provide the required steam capacity, pressure, fuel availability and production schedule for a matched JINHONG boiler proposal.
